シャッフルカジノ プロモコードtionMelting FurnacesFMI Series、Magcaster Series
Vacuum Furnace

シャッフルカジノ プロモコードtion
Melting FurnacesFMI Series、
Magcaster Series

シャッフルカジノ プロモコード
シャッフルカジノ プロモコード

Since the first unit was produced in 1957, ULVAC has delivered over 200 シャッフルカジノ プロモコードtion melting furnaces to customers in Japan and around the world. These furnaces are contributing to a wide range of industry applications such as specialized steel, electronics materials and new materials. They have been used in developing new technologies such as high-vacuum degassing and refining using cryopanels, and multi-element alloys created by single-direction agitation systems. ULVAC can also provide equipment lines and production technology for rare-earth magnet manufacturing.

シャッフルカジノ プロモコード
シャッフルカジノ プロモコード

Features

  • Cryopanels create outstanding degassing effect.
  • Large volumes of activated metal can be added and controlled.
  • Outstanding ingot cleaning
  • Single-direction agitation creates outstanding component uniformity
  • Rapid heating, for outstanding operability
  • Selectable casting type:black and strip casting

Applications

  • Fe-base alloys : Mechanical tools (hob cutters, pinions, cutting tools), dies, bearing steel
  • Rare-earth metals : Magnets (Nd-Fe-B, Sm-Co)
  • Ti alloys : Shape-memory alloys, hydrogen-absorbing alloys
  • Precious metals: Bonding wires, Au, Pt, thermocouples, electric contact materials, dental products, ornaments
  • Ni-base alloys : Heat-resistant steel, corrosion-resistant materials, electrical part materials, permalloys
  • Al : Bonding wires, lead frames, sputter targets
  • Cu : Electric contact materials, lead frames
  • Cr : Sputter targets

Specifications

Model FMI-1 (batch type)
Melted materials Iron, nickel, iron-base alloys or nickel-base alloys
Standard melting volume 5Kg to 100kg
Output/frequency 25kW/10kHz to 100, kW/1kHz
Standard time until melting (thermal furnaces) 30 to 60 minutes
Pressure after melting (standard) 1.3x10-1Pa(10-3Torr)
シャッフルカジノ プロモコードply for melting (3φ, 440 V, 50/60 Hz) About 25 to 120 kVA
Operation シャッフルカジノ プロモコードply (3φ, 200/220 V, 50/60 Hz) About 10 to 25 kVA
Cooling water (0.3 MPaG (3 kg/cm2G)) About 3 to 12 tons/hour
Compressed air (0.6 MPaG (6 kg/cm2G)) Some
Installation area 6 x 5 x 3 to 7 x 7 x 5 (L x W x H; m)

Model FMI-2(semi-continuous type)
Melted materials Iron, nickel, iron-base alloys or nickel-base alloys
Standard melting volume 100Kg to 1000Kg
Output/frequency 100kW/1kHz to 500kW/500kHz
Standard time until melting (thermal furnaces) 60 to 120 minutes
Pressure after melting (standard) 1.3 x 10-1Pa(10-3Torr)
シャッフルカジノ プロモコードply for melting (3 f, 440 V, 50/60 Hz) About 120 to 800 kVA
Operation シャッフルカジノ プロモコードply (3f, 200/220 V, 50/60 Hz) About 30 to 160 kVA
Cooling water (0.3 MPaG (3 kg/cm2G)) About 15 to 35 tons/hour
Compressed air (0.6 MPaG (6 kg/cm2G)) About 10 to 20 liters/minute
Installation area 11 x 8 x 5 to 17 x 14 x 8 (L x W x H; m)

This website use cookies to obtain and use access data to understand the convenience and usage of customers. If you agree to use cookies, click "I Accept".
5. Notification シャッフルカジノ ウィークリー

I Accept